TU Delft login

Long term test setup

Previous Page back |Print Document print | 225 of 357 | « previous | next »

long_term_test.jpg

Contact details

Berkhout, Peter
Civil Engineering and Geosciences (CiTG), Section GCC
Stevinweg 1, 2628 CN Delft
Tel : Not available
E-mail : S.P.M.Berkhout@tudelft.nl
Website : Not available

General Information

Instrument:

Long term test setup

Location:

CiTG, Stevin Lab I, Stevinweg 4

Key words:

long term, test, durability, aging

Main application:

Testing mechanical connections over long time periods.

Instrument specification

This setup is developed to test mechanical connections over long time periods, with or without the use of weights. Some of the connections being tested started in 1963 and are still present.